Laurie and Ken

Laurie and Ken

Saturday 14 May 2016


First coat of epoxy
 I have filled in the blister holes and applied my first coat of epoxy.



So now I have two weeks before the boat goes in the water. I have five more coats of epoxy and two coats of antifouling paint to apply. The weather is not warm enough so it looks like everything with be done the last minute.
Six more weeks before we leave and still lots to do.

No comments:

Post a Comment